Working Timetable - Cardiff and Western Valleys
- SERVICE TIME TABLES
- Section 9

- CARDIFF to and from MERTHYR, ABERDARE, TREHERBERT, BLAENYCWM, CORYTON, SENGHENDYDD, RHYMNEY BRIDGE, PENARTH, BARRY and BRIDGEND
- 10 September 1951 until further notice
- This WTT contains the following tables
- Banking, Pilot and Shunting Engines
- Barry and Bridgend
- Cadoxton and Trehafod Junction
- Calculating Loads of Freight Trains
- Cardiff and Barry Pier
- Cardiff to Coryton, Sengenydd and Rhymney Bridge
- Cardiff, Pontypridd, Merthyr, Aberdare (Low Level)
- Cardiff and Pontypridd (via St.Fagans)
- Classification of Special Wagons
- Common Branch Junction and Waterhall Junction
- Dare Valley, Mill Street and Bwlfa
- Dimensions of Vehicles over 21 feet in length
- Engines in Steam coupled together, Working of
- Freight Train Services
- Llantrisant and Cowbridge
- Maximum Loads for Passenger Trains
- Maximum Loads for Freight Trains
- Maximum speed of trains through Junctions
- Mineral Trains
- Nelson and Llancaiach and Dowlais(Central)
- Pilot Services Cardiff to Radyr Junction, Barry etc
- Radyr Junction and Penarth Curve
- Ready Reckoner
- Refuge Sidings and Loops
- Rhondda Branches
- Signal Boxes
- Table for computing maximum loads - 20-Ton wagons etc
- Time Allowances for Freight and other booked Train Engines from Shed
- Working of Large Engines
- Ynysybwl Branch
- 283 Pages, 6" x 9½", 300g
- Back To WTT Index
- Section 9 - Main Working Timetable
- See a schematic of the area covered
- Condition - Very good, front and rear cover have been taped back together, minor discolouration
SOLD Enquire
- Other TimeTables Post And Prior To This Example
-
10 September 1951 until further notice
Passenger & Freight
- Schematic Map Of Area Covered

- Section 9 - 10 September 1951 until further notice
- Timetables Adjoining This