Working Timetable - SWANSEA and the West
- WORKING TIME TABLE of PASSENGER and FREIGHT TRAINS
- Section 8

- SWANSEA. MILFORD HAVEN and BRANCHES
- 4 May 1970 to 2 May 1971
- This WTT contains tables for the following:
- Craven Arms and Llanelli
- Explanation of References
- Four Character Train Identification System
- Milford Haven and Fishguard Harbour to Swansea
- Notes on working of Single Line and other Sections
- Point to Point times for Passenger and Express Parcels Trains
- Point to Point times for Motorail, Freightliner, Parcels and Express Freight Trains (maximum speed 75mph)
- Point to Point times for freight and Parcel Trains
- Swansea to Fishguard Harbour and Milford Haven
- Whitland and Pembroke Dock
- G.Graham, Movements Manager - Paddington
- 66 Tables, 7½" x 11½"
- Back To WTT Index
- BR31406/16 - Main Working Timetable
- See a schematic of the area covered
- Condition - Very good, some cover creasing
£12.00 Order or Enquire
- Other TimeTables Post And Prior To This Example
-
4 May 1970 to 2 May 1971
Passenger & Freight
-
3 May 1971 to 30 April 1972
Passenger & Freight
- Schematic Map Of Area Covered

- Section 8 - 4 May 1970 to 2 May 1971
- Timetables Adjoining This